Monday, July 30, 2012

Lockers


For those wondering what the mudroom "lockers" are - here's a picture of them.  Essentially a shelf up top with coat hooks, bead-board below, and then a bench with built in drawers.

Thursday, July 26, 2012

Google Maps


Google must have updated the Pekin-area satellite imagery, because it now shows our house (it's the new one in the lower-right)!

Wednesday, July 25, 2012

Counter tops, lockers, & gutters



The granite is in.  The lockers (drawers & coat hooks) have been installed in the mud room.  The gutters and downspouts are done.

Monday, July 23, 2012

Too much to say in a title


While we were gone on vacation, a lot of things got done.  The wood floor got completed.  All of the tile got laid, including the tiled shower in the master bathroom.  The trim and mantle were put in place.  Doors got hung.  Newels and handrails are in (but not balusters/spindles).  Cabinets got installed.  The rest of the driveway, sidewalk, and patio got poured.








Sunday, July 8, 2012

More Flooring





The wood flooring is almost done.  Just a little bit left in the master bedroom.  And the cabinets have been delivered, but not installed yet.

Thursday, July 5, 2012

Primer and Flooring



Its amazing what some primer and flooring can do - the house looks much more complete now.

The entire house has been primered, though no paint has been put on the walls.  The wood flooring (natural hickory) has largely been completed in the great room.  The air conditioning has been hooked up and turned on.  It looks like the driveway is being prepped for concrete.  I also just talked to our builder, and he mentioned that cabinets might be coming today.

Thursday, June 28, 2012

Garage Doors, More Mud




The garage doors are now up.  Finishing the drywall almost complete - it looks like most, if not all, of the compound has been applied.  A little bit of sanding may be needed.  Some light texture has been sprayed on the ceilings.  Also, Ameren has hooked up the electricity.  The gas meter is up, but lines haven't been run into the house.  Lastly, it looks like most of the ductwork has been done.

Things are moving really fast.  We've just picked out paint, flooring, and appliances.  Within the coming week we'll be picking out light fixtures.  Not too much left to decide on (whew!).